TIME SCHEDULE

The project has been designed from a technical point of view for a 25-year period. This means that when designing the capacity, of, for example, the network of pipes, the growth of population during this period is taken into account.

Depicted below is the plan for the steps that will be taken for the implementation of the project for community building and reliable drinking water in Ambalgan.
 

September 2007
Investigation into the water shortage and design of a new system April 2008
Purchase of a piece of land in Ambalgan for the drinking water system
March - December 2008
Fundraising in the Netherlands: € 50,000.00
End of 2009/beginning 2010
Start of the construction of the drinking water system
2010 - 2015
Intensive training and supervision by Taytayan

tijdslijn van het drinkwater project

December 2007
Initial start of the establishment of 'Stichting Water voor Filippijnen’
September 2008
Start of training of the local people and preparations for the organisation
2009 Mid 2010
Drinking water system operational _____________________
2015 - 2020
Step by step, the project will be fully managed by the local population